{"id":422,"date":"2009-03-25T03:34:35","date_gmt":"2009-03-25T03:34:35","guid":{"rendered":"https:\/\/thaisonbac.com.vn\/?p=422"},"modified":"2013-11-26T03:36:14","modified_gmt":"2013-11-26T03:36:14","slug":"ls-cable-bus-way-launching-ceremony","status":"publish","type":"post","link":"https:\/\/thaisonbac.com.vn\/en\/ls-cable-bus-way-launching-ceremony\/","title":{"rendered":"LS Cable Bus Way Launching Ceremony"},"content":{"rendered":"<p><strong>LS Cable Bus Way Launching Ceremony was organized on the 25th of March, 2009 at Horizon Hotel Hanoi. More than one hundred representatives of the companies which operate \u00a0in Consultants, Constructions have joined the Ceremony.<\/strong><\/p>\n<p>After the speech of Mr. Bui Dinh Te &#8211; Thai Son Bac Director , the \u00a0attendants listened to Mr. Tea Won Son &#8211; Deputy General Manager \u00a0from LS Cable. In brief, Mr. Tea Won Son introduced \u00a0LS Cable, LS Group and the achievements that LS Cable gained with Bus Way. The most important point of the Ceremony is that Mr. Tea Won Son emphasized the technical informations of the Bus Way as compared with that of competitors\u2019 product.<\/p>\n<div id=\"attachment_424\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/thaisonbac.com.vn\/wp-content\/uploads\/2013\/11\/DSCN0999.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-424\" class=\"size-medium wp-image-424\" alt=\"From the left, Mr.Bui Dinh Te - Thai Son Bac Director , Mr. Nguyen Hong Hai - Thai Son Nam Director, Mr. Seon Kook Kim - LS Vina Cable General Director, Mr. Nguyen Hong Son - Duc Viet Director, standing Mr. Tea Won Son - LS Cable Deputy General Manager    \" src=\"https:\/\/thaisonbac.com.vn\/wp-content\/uploads\/2013\/11\/DSCN0999-500x374.jpg\" width=\"500\" height=\"374\" srcset=\"https:\/\/thaisonbac.com.vn\/wp-content\/uploads\/2013\/11\/DSCN0999-500x374.jpg 500w, https:\/\/thaisonbac.com.vn\/wp-content\/uploads\/2013\/11\/DSCN0999-150x112.jpg 150w, https:\/\/thaisonbac.com.vn\/wp-content\/uploads\/2013\/11\/DSCN0999-400x299.jpg 400w, https:\/\/thaisonbac.com.vn\/wp-content\/uploads\/2013\/11\/DSCN0999.jpg 575w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/a><p id=\"caption-attachment-424\" class=\"wp-caption-text\">From the left, Mr.Bui Dinh Te &#8211; Thai Son Bac Director , Mr. Nguyen Hong Hai &#8211; Thai Son Nam Director, Mr. Seon Kook Kim &#8211; LS Vina Cable General Director, Mr. Nguyen Hong Son &#8211; Duc Viet Director, standing Mr. Tea Won Son &#8211; LS Cable Deputy General Manager<\/p><\/div>\n<p>Mr.Tea Won Son ended his speech with the notification that Thai Son Bac anh Thai Son Nam had been appointed as Bus Way Authorized Importer and Distributor in Vietnam.<\/p>\n<p><a href=\"https:\/\/thaisonbac.com.vn\/wp-content\/uploads\/2013\/11\/DSCN0973.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-425 aligncenter\" alt=\"DSCN0973\" src=\"https:\/\/thaisonbac.com.vn\/wp-content\/uploads\/2013\/11\/DSCN0973-500x374.jpg\" width=\"500\" height=\"374\" srcset=\"https:\/\/thaisonbac.com.vn\/wp-content\/uploads\/2013\/11\/DSCN0973-500x374.jpg 500w, https:\/\/thaisonbac.com.vn\/wp-content\/uploads\/2013\/11\/DSCN0973-150x112.jpg 150w, https:\/\/thaisonbac.com.vn\/wp-content\/uploads\/2013\/11\/DSCN0973-400x299.jpg 400w, https:\/\/thaisonbac.com.vn\/wp-content\/uploads\/2013\/11\/DSCN0973.jpg 575w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p>Seeing the advantages of Bus Way, most of the attendants raised their interest in the price of LS Cable Bus Way in Vietnam.<\/p>\n<div id=\"attachment_426\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/thaisonbac.com.vn\/wp-content\/uploads\/2013\/11\/DSCN0954.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-426\" class=\"size-medium wp-image-426\" alt=\" The attendants saw the sample Bus Way in the Ceremony\" src=\"https:\/\/thaisonbac.com.vn\/wp-content\/uploads\/2013\/11\/DSCN0954-500x374.jpg\" width=\"500\" height=\"374\" srcset=\"https:\/\/thaisonbac.com.vn\/wp-content\/uploads\/2013\/11\/DSCN0954-500x374.jpg 500w, https:\/\/thaisonbac.com.vn\/wp-content\/uploads\/2013\/11\/DSCN0954-150x112.jpg 150w, https:\/\/thaisonbac.com.vn\/wp-content\/uploads\/2013\/11\/DSCN0954-400x299.jpg 400w, https:\/\/thaisonbac.com.vn\/wp-content\/uploads\/2013\/11\/DSCN0954.jpg 575w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/a><p id=\"caption-attachment-426\" class=\"wp-caption-text\">The attendants saw the sample Bus Way in the Ceremony<\/p><\/div>\n<p>After the break, the attendants kept on making questions about Bus Way. One of the attendants asked : \u201c What kind of project do we use for Bus Way? \u201d \u2013 \u201c We can use Bus Way for high \u2013 rise building or factory plant to use the power from 1000A \u201d answered Mr.Lai Duc Phuong \u2013 Deputy Director of Thai Son Bac. Then he continued: \u201c In this case, the project using Bus Way will be more economical than that using power cable \u201d.<\/p>\n<p><a href=\"https:\/\/thaisonbac.com.vn\/wp-content\/uploads\/2013\/11\/Plug-in-Box.png\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-427 aligncenter\" alt=\"Plug in Box\" src=\"https:\/\/thaisonbac.com.vn\/wp-content\/uploads\/2013\/11\/Plug-in-Box.png\" width=\"370\" height=\"516\" srcset=\"https:\/\/thaisonbac.com.vn\/wp-content\/uploads\/2013\/11\/Plug-in-Box.png 370w, https:\/\/thaisonbac.com.vn\/wp-content\/uploads\/2013\/11\/Plug-in-Box-107x150.png 107w, https:\/\/thaisonbac.com.vn\/wp-content\/uploads\/2013\/11\/Plug-in-Box-286x400.png 286w\" sizes=\"auto, (max-width: 370px) 100vw, 370px\" \/><\/a><\/p>\n<p>Another asked: \u201c How does Bus Way distribute main line to each lot? \u201d &#8211; \u201c We can use Plug in Box at the position where we want to get power from the main line, Plug in Hole will be made within Bus Way. We plug the Plug in Box in that hole. In Plug in Box, we can install MCCB \u201d answered Mr. Phuong.<\/p>\n<p>The Ceremony has ended with prospect of a successful future.<\/p>\n<p style=\"text-align: right;\"><strong>TSB<\/strong><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>LS Cable Bus Way Launching Ceremony was organized on the 25th of March, 2009 at Horizon Hotel Hanoi. More than one hundred representatives of the companies which operate \u00a0in Consultants, Constructions have joined the Ceremony. After the speech of Mr. Bui Dinh Te &#8211; Thai Son Bac Director , the \u00a0attendants listened to Mr. Tea [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":431,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-422","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tin-ls"],"_links":{"self":[{"href":"https:\/\/thaisonbac.com.vn\/en\/wp-json\/wp\/v2\/posts\/422\/"}],"collection":[{"href":"https:\/\/thaisonbac.com.vn\/en\/wp-json\/wp\/v2\/posts\/"}],"about":[{"href":"https:\/\/thaisonbac.com.vn\/en\/wp-json\/wp\/v2\/types\/post\/"}],"author":[{"embeddable":true,"href":"https:\/\/thaisonbac.com.vn\/en\/wp-json\/wp\/v2\/users\/1\/"}],"replies":[{"embeddable":true,"href":"https:\/\/thaisonbac.com.vn\/en\/wp-json\/wp\/v2\/comments\/?post=422"}],"version-history":[{"count":0,"href":"https:\/\/thaisonbac.com.vn\/en\/wp-json\/wp\/v2\/posts\/422\/revisions\/"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/thaisonbac.com.vn\/en\/wp-json\/wp\/v2\/media\/431\/"}],"wp:attachment":[{"href":"https:\/\/thaisonbac.com.vn\/en\/wp-json\/wp\/v2\/media\/?parent=422"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thaisonbac.com.vn\/en\/wp-json\/wp\/v2\/categories\/?post=422"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thaisonbac.com.vn\/en\/wp-json\/wp\/v2\/tags\/?post=422"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}